.Buildings.DHC.ETS.Combined.Subsystems.Validation.SwitchBox

Validation of flow switch box

Information

This model validates that Buildings.DHC.ETS.Combined.Subsystems.SwitchBox maintains a positive flow rate in the district line outside of the temporization period set by the controller.

Contents

Name Description
 Medium Medium model

Generated at 2026-05-09T18:18:56Z by OpenModelicaOpenModelica 1.26.7 using GenerateDoc.mos